Run #6

manual · 11 captured · 0 failed

Status
completed
Captured
11
Duration
15.4s
Held
3
captureidentityanalyserespondersactionssummaryreport

Daily report

Letterheaded PDF, generated automatically at the end of the run and delivered to both managers.

Open PDF
RecipientChannelModeStateNote
manager1@yt.infra.superfastech.comemaillivesentdelivered via SMTP to manager1@yt.infra.superfastech.com
manager2@yt.infra.superfastech.comemaillivesentdelivered via SMTP to manager2@yt.infra.superfastech.com

Executive summary

11 messages captured and 10 analysed. 2 staff did not reply. 3 items require manager attention. 3 reminders are awaiting approval. 3 items were held for human review rather than guessed.

Per-message AI result

Confidence is shown against the 0.75 threshold. Anything left of the line is held for a human rather than written to the register.

MsgChannelFromMessageStatusTaskConfidenceOutcome
MSG01emailLim Wei Jie
s01@yt.infra.superfastech.com
Task A completed. All materials delivered on time.
Task A completed. All materials delivered on time.
doneTask A
0.99above 0.75
register updated
MSG02emailNurul Aisyah
s02@yt.infra.superfastech.com
Task B - still waiting for supplier.
Task B - still waiting for supplier.
blockedTask B
0.99above 0.75
register updated
MSG03emailTan Boon Huat
s03@yt.infra.superfastech.com
Task C - almost there.
Task C - almost there.
in progressTask C
0.99above 0.75
held — ambiguous
task is certain, status is not
MSG04emailRajesh Kumar
s04@yt.infra.superfastech.com
Progress note for the riser installation. Photo of the site attached, plus the signed delivery order PDF for the cable trays.
Progress note for the riser installation. Photo of the site attached, plus the signed delivery order PDF for the cable trays.
in progressTask D
0.89above 0.75
register updated
MSG05emailLim Wei Jie
s01@yt.infra.superfastech.com
Can we reschedule the site meeting?
Can we reschedule the site meeting?
unclearno matchnot a status update
MSG06whatsappAhmad Firdaus
60001@lid
Piling at Berth 3 done ✅
Piling at Berth 3 done.
doneTask G
0.99above 0.75
register updated
MSG07whatsappGoh Chee Kong
60002@lid
Task H blocked - waiting for supplier, no ETA
Task H blocked - waiting for supplier, no ETA.
blockedTask H
0.99above 0.75
register updated
MSG08whatsappZhang Wei
60003@lid
任务F已完成,材料已送到
Task F is completed, and the materials have been delivered.
doneTask F
0.99above 0.75
register updated
MSG09whatsappSiti Nadhirah
60004@lid
👍
Reaction only; no status stated.
in progressno matchheld — ambiguous
task is certain, status is not
MSG10whatsappAhmad Firdaus
60001@lid
Update on cable pulling works at Zone 4 for this week. The team mobilised on Monday with four technicians and completed the pull for risers 1 through 6 ahead of…
The team mobilised on Monday with four technicians and completed the pull for risers 1 through 6 ahead of the planned sequence. Cable drums for the remaining risers were delivered on Wednesday and have been checked against the delivery order.
in progressTask I
0.99above 0.75
register updated
MSG11whatsappunknown
+6599999999
Hi, is the site open tomorrow?
no matchunknown sender

Run summary

Completed (3)

  • Task A: Task A completed. All materials delivered on time. (Lim Wei Jie)
  • Task F: Task F is completed, and the materials have been delivered. (Zhang Wei)
  • Task G: Piling at Berth 3 done. (Ahmad Firdaus)

In progress (2)

  • Task D: Progress note for the riser installation. Photo of the site attached, plus the signed delivery order PDF for the cable trays. (Rajesh Kumar)
  • Task I: The team mobilised on Monday with four technicians and completed the pull for risers 1 through 6 ahead of the planned sequence. Cable drums for the remaining risers were delivered on Wednesday and have been checked against the delivery order. (Ahmad Firdaus)

Blocked / overdue (3)

  • Task B (Nurul Aisyah): still waiting for supplier → Daniel Ong. Recommended: Contact the supplier for a firm delivery date on Task B. If none is given today, source an alternative and inform Nurul Aisyah.
  • Task E (Chua Mei Ling): overdue since 2026-07-20 → Priya Menon. Recommended: Task E is past its due date with no completion reported. Confirm revised completion date with Chua Mei Ling and reforecast downstream work.
  • Task H (Goh Chee Kong): waiting for supplier, no ETA → Daniel Ong. Recommended: Contact the supplier for a firm delivery date on Task H. If none is given today, source an alternative and inform Goh Chee Kong.

No reply (2)

  • Chua Mei Ling (QS) did not reply
  • Kamal Hassan (M&E) did not reply

Held for review (3)

  • [unknown_sender] no roster entry for +6599999999
  • [ambiguous_status] 'Task C - almost there.' — progress stated without a resolvable state
  • [ambiguous_status] 'Reaction only; no status stated.' — progress stated without a resolvable state